Mining Laser: Difference between revisions
Jump to navigation
Jump to search
Totengeist (talk | contribs) (→History: Update history) |
(Update file names) |
||
(One intermediate revision by one other user not shown) | |||
Line 7: | Line 7: | ||
| power_category = Logistics | | power_category = Logistics | ||
| inputs = Power | | inputs = Power | ||
| image1=[[File:MiningLaser.png|210px|frameless]] | |||
}} | }} | ||
Mining Lasers are required to mine [[Asteroid]]s for [[Ore]], which must be collected via [[Logistics Drone]]s. They drain power on every shot. | Mining Lasers are required to mine [[Asteroid]]s for [[Ore]], which must be collected via [[Logistics Drone]]s. They drain power on every shot. |
Latest revision as of 10:03, 23 June 2023
Mining Laser | |
---|---|
Grid size | 3 x 2 (6 x 3 clearance required) |
Power consumption |
1 MW constant 10 MW when charging 300 MW when firing |
Power category | Logistics |
Inputs | Power |
Mining Lasers are required to mine Asteroids for Ore, which must be collected via Logistics Drones. They drain power on every shot.
A Mining Laser is placed into the Hull of a Ship and is 3 x 3, with a 6 x 3 area of unobstructed space required, giving a total size of 9 x 3.
History[edit | edit source]
- Update1.rc2: Introduced.
- Update2.rc1: Added interior placement constraint.
- Update2.rc1: Removed interior placement constraint.
- DEMO3A: Changed height from 3 to 2.