Scaffolding: Difference between revisions

3 bytes added ,  09:09, 28 July 2023
m
'Space suit' -> 'Spacesuit'
(difference in cost in shipyards vs creative mode)
m ('Space suit' -> 'Spacesuit')
Line 8: Line 8:
If equipment on the scaffolding is disassembled, it can only be picked up by drones.
If equipment on the scaffolding is disassembled, it can only be picked up by drones.


For assembling and disassembling equipment on the scaffolding, the policy Exterior Work has to be active, space suits with oxygen have to be available and a docking port has to be installed.
For assembling and disassembling equipment on the scaffolding, the policy Exterior Work has to be active, [[spacesuit]]s with oxygen have to be available and a docking port has to be installed.


While scaffolds are billed per square at shipyards they cost $29.94 per square in creative mode and they are only billed for every 334th square effectively giving you your first 333 scaffolds for free.
While scaffolds are billed per square at shipyards they cost $29.94 per square in creative mode and they are only billed for every 334th square effectively giving you your first 333 scaffolds for free.
[[Category:Construction material]]
[[Category:Construction material]]
editors
316

edits