editors
60
edits
No edit summary |
No edit summary |
||
Line 14: | Line 14: | ||
*1 crew produces ~1,9 sewage/min or ~0,032 sewage/s if cabin available | *1 crew produces ~1,9 sewage/min or ~0,032 sewage/s if cabin available | ||
*co2 scrubber stores 20 co2 | *co2 scrubber stores 20 co2 | ||
*co2 scrubber scrubs ~6,5 co2/s => ~ 1 co2 scrubber per 100 crew | *co2 scrubber scrubs ~6,5 co2/s | ||
*airduct raises the atmosphere by 10 o2/s or ~1,4 % | **=> ~ 1 co2 scrubber per 100 crew | ||
*airduct raises the atmosphere by 10 o2/s or ~1,4 % | |||
**==> ~1 airduct per 150 crew | |||
*air reprocessor stores 25 co2 in ~9,3 s and produces 25 o2 in ~8,5 s during startup/shutdown | *air reprocessor stores 25 co2 in ~9,3 s and produces 25 o2 in ~8,5 s during startup/shutdown | ||
*air reprocessor converts ~2,5 co2/s to ~2,5 o2/s during normal operation | *air reprocessor converts ~2,5 co2/s to ~2,5 o2/s during normal operation | ||
Line 25: | Line 27: | ||
*waste treatment machine converts ~2 sewage/s to ~1,8 waste water/s and ~0,2 compost/s during normal operation | *waste treatment machine converts ~2 sewage/s to ~1,8 waste water/s and ~0,2 compost/s during normal operation | ||
*sewage pipe stores undefined ammounts of sewage | *sewage pipe stores undefined ammounts of sewage | ||
*sewage pipe supplies 20 sewage/s ==> 1 sewage pipe per 625 people | *sewage pipe supplies 20 sewage/s | ||
**==> 1 sewage pipe per 625 people | |||
*loader loads 20 1/s | *loader loads 20 1/s | ||
*airduct uses/delivers as much o2 as needed by the crew/passengers up to | *airduct uses/delivers as much o2 as needed by the crew/passengers up to | ||
*tanks an pipes have now limit for delivery | *tanks an pipes have now limit for delivery |